
Ball Valves
Q71F-16P Ball Valve
Review the available technical parameters, drawings, or sheets below. Final configuration, dimensions, and required documentation are confirmed against your RFQ.
⇄ Engineering Unit & Standard Converter (DN ↔ NPS / PN ↔ Class / MPa ↔ PSI)+
Product specifications
Specifications
- Size
- DN15-DN200
- Pressure
- PN16/150LB/10K
Published values describe the available catalogue reference. Final configuration is confirmed against the RFQ.
Additional GB PN16 family reference
Thin-body ball valve: additional GB PN16 reference lengths
This table describes an additional illustrated pneumatic/electric thin-body GB PN16 family. It does not establish a dimensional match to the original Q71F-16P record, replace its existing drawings, or prove interchangeability. Confirm the selected model and flange details before ordering.
| Nominal size | L (mm) |
|---|---|
| DN15 | 42 |
| DN20 | 44 |
| DN25 | 50 |
| DN32 | 60 |
| DN40 | 65 |
| DN50 | 80 |
| DN65 | 110 |
| DN80 | 120 |
| DN100 | 150 |
| DN125 | 180 |
| DN150 | 225 |
| DN200 | 275 |
Can the Class 150 version use this same table?
No. The catalogue gives GB PN16 and ASME Class 150 separate tables. Some L dimensions coincide, while others and the flange/interface dimensions differ. This table must not be used as a Class 150 drilling or mounting reference.
What should be checked before replacing an installed valve?
Send the existing installation length, pipe and flange details, bolt-hole pattern, bore requirement, material and seat specification, medium, operating pressure and temperature, and actuator envelope. Thin-body construction alone does not confirm a drop-in replacement.
Compare all ball valves · Prepare a valve RFQ · Compare seat requirements
Technical Drawings
Reference drawings support requirement review. Final dimensions are confirmed against the RFQ before quotation.


Procurement Summary
Published facts for this product include Size: DN, NPS, DN15-DN200; Pressure: PN16/150LB/10K. Share the required model, project specification and document list for confirmation before quotation.
Document Status
Required documents are confirmed for the quoted product and project requirements.